4
We are told to automate everything in the sprint it ships. But the UI for this feature has been redesigned three times in a month, and I have rewritten the same tests three times.
Is there a rule of thumb for when a feature is stable enough to automate?
asked 2026-08-12
Ravi Menon 120
- We wait two sprints after the last major UI change. Not scientific but it helps. — Ada Tester